This install was a little tricky, but we pulled it off!
|
Installation of the base into the purpose built wall. As you can see, the flue is offset, idealy we would have prefered a straight flue install, but due to the architects drawings, and that directly above is the middle of the master bedroom, it had to go here. |
|
This is the flue passing through the wall, and going up through the second story floor. Later this was closed in with shelving. |
|
Normally we would install the fire after the rooms are finished, but the customer wanted it in first. This is the flue passing through the upstairs walk in wardrobe. |
|
The fire mounted onto its base. |
|
Side view. |
|
The exhaust is just visable to the left of the solar panels. |
|
We left the plastic on the stainless steel fascia because there is a brick wall to be built around the fire to close the wall in, I have seen it, when it was completed, but I didn't have my camera. It looked awesome, and more important, the customer was very happy. |