Broken Arm. |
Broken Arm. |
Made one aluminium arm, came out pretty good, so I decided to do both! |
Two arms. |
Side view. |
Front view. |
Damaged chain brake pin mount. |
Also had very worn top cover mount. |
I had ground out the insert & built back up with magnesium. |
View from other side. |
Built up before drilling. |
Cover mount ground down, built back up, reshaped, drilled & re-taped. |
Brake lever pin mount before drilling for pin. |
Drilled and pin installed. |
I bought the Joplin Seat Post off Trade Me for $50.00, so the first step, was to strip it and replace the worn parts, clean and reassemble. |
Reassembled and tested...all set for modification to take DIY remote. |
I wanted to make it an internal mechanism, so that dirt couldn't get in. I cut a slot into the front of the post, to accommodate the lever I was making. |
Rear view of slot. |
Small lever manufactured & ready for install. |
Lever installed. |
I had drilled a hole to allow for cable, making sure I aligned it with the lever. |
Made up a boot out of an old tube, to keep out the mud. |
Made up a remote trigger out of aluminium off-cuts & an adjuster off an old derailleur. |
Installed...works perfectly. |
Installed trigger. |
Crankshaft had broken off at the end of the clutch thread. |
Removed tank, starter, muffler, clutch, oiler etc, ready to steam clean. |
Cleaned, now dismantle further. |
Fully dismantled & cleaned. |
New gasket set & crankshaft under warranty. |
The crankcase halves have been heated & bearings re-installed. |
Crankshaft installed, along with new gasket & seals. |
Right hand, top AV mount & tank bumper fitted, as well as oil tank reflector foil. |
Fitting fuel tank, connecting impulse line & feeding stop switch wires through crankcase. |
Installing AV mounts, oil pump, oil ring & hose. |
Installing cylinder & piston. |
Flywheel, coil & stop switch wires installed. |
Chain brake & chain adjuster installed. |
Oiler drive, clutch & covers installed. |
Top cover, plug & manifold rings installed. |
Carb, grommet, fuel line & throttle linkage installed. |
Filter base installed. |
Finished. |
Tuned ready for pick up. |
Marking out & cutting. |
Cut out, ready for weld. |
Clamped for welding. |
Welded & ready for finishing/filing. |
Finished & mounted. |
Cost to make, materials...nothing, was from scrap aluminium, labour...about 2 hours, it would've been easier to buy, but then I wouldn't have a one off SRAM X7 Shifter Mount. |