Replacing an existing woodfire, with a compliant Clean Air Approved woodfire.
|
Leveling the liner. In this case, there isn't alot of ceiling space to anchor the liner, so we will be using stays to make the liner more rigid. |
|
I pre-painted the liner before install. You can see that there is a shield installed to protect the beam and we have left the protective plastic on the cieling panel, incase we have to touch up paint. |
|
Liner in place, ready for soaker flashing prep work. |
|
Soaker, with liner hole cut, the 4 tabs will be bent up to attach to the liner. |
|
We have dammed of the channels between the ribs, just below the roof penetration, this is to stop the weather getting in from the bottom. |
|
Soaker & Dectite installed, stays fitted and flue installed, chimney complete. |
|
The finished product, Jayline SS400. |
|
Completed view of ceiiling. |